Nesra Offers Master Planning and Schematic Design Services. Below are some of our most recent projects:
97 Summer Street Park (MA)
​
Nesra Engineering has been working with the City of Everett on creating a brand new park on Summer Street. Improvements to the site include changes to the grading, adding a retaining wall, new wood fencing, a potential water fountain structure, a shade shelter wth ADA accessible seating, beautiful ADA accessible red paver walkways, small children's playground with rockers, and much more. Nesra is providing the following services for the City of Everett:
​
-
Site Assessment
-
Surveying
-
Schematic Design
-
3D Rendering Design
-
Civil / Site Design
-
Documentation/Regulatory Assistance
Schematic Design for 97 Summer Street.
At the direction of the City of Everett, Nesra created a concept sketch of the proposed new park.
Front view of the proposed new park, showing a 3D sketch of a water fountain and shade shelter.
Aerial view of the proposed park with children's playground in the back.
Mayor Carlo DeMaria Proposes a New Passive Park on Summer Street to Add More Green Space in Everett.
Beautiful Pavers, Unique Water Fountain, Nice Shade Shelter, and Children's Playground is Proposed at 97 Summer Street.
Newly Proposed Pocket Park in Everett Aerial View.
This pocket park in Everett will serve the surrounding community and businesses by offering a relaxing space to gather.
Park Street Plaza (MA)
​
Nesra Engineering has been working with the City Everett on improvements to Park Street Plaza. Nesra was asked to provide concept drawings to improve this passive park with a beautiful Gazebo, ADA accessible walkways, colorful plantings, granite curbing and new seating areas. Nesra has provided the City of Everett with the following services:
​
-
Site Assessment
-
Surveying
-
Schematic Design
-
Civil / Site Design
Proposed Concept Sketch of Park Street Park
Florence Street Park (MA)
Jacob Scharf Playground
​
Nesra is presently working with the City of Everett on the final phase of the Florence Street Park Project. Phase II of the master plan outlines a new multi-purpose soccer and baseball field along with Musco Lighting, new dugouts, paving and walkways, landscape elements with a robust irrigation system, and new support walls around the perimeter. This project is expected to begin in the summer of 2021. Nesra is providing the City of Everett with the following services:
​
-
Site Assessment
-
Facility Master Plan
-
Civil / Site Design
-
Permitting
-
Documentation/Regulatory Assistance
-
Surveying / Construction Layout
Aerial Concept View of Florence Street Athletic Facilities.
Concept view from the south-side of the proposed facility.
In-field view of the baseball/soccer field from second base.
Flash Road Park (MA)
​
Nesra Engineering has been working with the Town of Nahant on improvements to Flash Road Park. This project outlines grading improvements, new basketball court and two multi-functional tennis and pickleball courts. Nesra has provided Nahant with the following services:
​
-
Site Assessment
-
Surveying
-
Schematic Design
-
Civil / Site Design
-
Documentation/Regulatory Assistance
Taunton High School (MA)
​
Nesra continues to work with Taunton High School through this multi-phased project. Phase III of the master plan outlines a new synthetic football field and running track expected to begin in the spring of 2020. Nesra has provided Taunton High School with the following services:
​
-
Site Assessment
-
Facility Master Plan
-
Civil / Site Design
-
As-Built Design Plans
-
Permitting
-
Documentation/Regulatory Assistance
-
Surveying / Construction Layout
New Athletic Field Design for Taunton High School
Hexagon Multi-purpose Athletic Design
Taunton High School Athletic Practice Field.
Leary & Yetten Fields (MA)
​
Nesra Engineering, LCC was honored in assisting the City of Waltham with their master planing needs for Leary & Yetten Fields. Design recommendations include a 400 meter track with field events, synthetic turf multipurpose athletic field, a synthetic turf baseball field, field house building with lockers and restrooms, 1,000 seat grandstand with press box and lift, updated field lighting, and parking lot expansion. Nesra has provided the City of Waltham with the following services:
​
-
Site Assessment
-
Facility Master Plan
-
Property Line Survey
-
Schematic Design
Sacramone Street Park (MA)
​
Nesra Engineering has been working with the City of Everett on major improvements to Swan Street Park. This project outlines grading improvements, new basketball court, new playground and shade structures, a beautiful splash pad area, green space for yoga & other exercise activities, new walkways, and seating areas. Nesra has provided the following services on this project:
​
-
Site Assessment
-
Schematic Design
-
Civil / Site Design
-
Permitting
-
Surveying
-
Construction Layout
-
Soil Testing
-
Documentation / Regulatory Assistance